skip to main
Close Menu

Kinston Bypass

Kinston Bypass
The map above shows only the project's general location. (View detailed maps)
Project Information Left Table
County:Multiple
Status:In Development
STIP Number:​R-2553
Project Information Right Table
Estimated Cost:​$716.2 million
Start Date:TBD
Completion Date:TBD

​​​​​​​​​​​​​​​​Project Overview

​​​​​​​​​​​​​​​Get the Latest News​

If you would like to be added to the project mailing list and be notified of upcoming public involvement opportunities, call the toll-free project hotline at (800) 233-6315 (bilingual option available) or send a message​.

​The proposed Kinston Bypass would be a four-lane, median divided freeway (accessible via ramps at interchanges) that extends approximately 21 miles from U.S. 70 near La Grange (in Lenoir County) to U.S. 70 near Dover (on the Jones-Craven county line). 

The project has a design speed of 70 mph and, when complete, would help reduce traffic congestion and delays that currently exist along U.S. 70 in Lenoir, Jones and Craven counties.​

The N.C. Department of Transportation selected Alternative 1SB as the Preferred Alternative, for the future bypass. NCDOT is evaluating three design options for upgrading the highway’s current at-grade intersection with Wyse Fork Road/Caswell Station Road in Jones County.​

This project will be reprioritized for funding in the next State Transportation Improvement Program​. A schedule for right of way, utilities and/or construction has not been finalized at this time. However, preliminary engineering activities (design, planning, environmental studies) needed for project development are underway.​

Get a Virtual Tour

NCDOT’s virtual room provides an interactive way to see the Kinston Bypass preliminary design. Visitors can scroll through the project area, zoom in on areas of interest as well as view maps and videos. 

Take a Tour Now
​​

Project Funding

This project is listed as Project R-2553 in the N.C. Department of Transportation's State Transportation Improvement Program and is partially funded. The total cost of the project is estimated to be $716.2 million.​

​​

Project Timeline

*Future dates subject to change

Contact

Toll-Free Project Hotline

(800) 233-6315

Heather C. Lane, P.E.

Project Development Engineer​
Highway Division 2

1037 W.H, Smith Blvd.
Greenville, NC 27835

Last updated Nov. 19, 2024