U.S. 74 Shelby Bypass

U.S. 74 Shelby Bypass
The map above shows only the project's general location. (View detailed maps)
Project Information Left Table
County:Cleveland
Status:Under Construction
STIP Number:R-2707AA, R-2707AB, R-2707B, R-2707C, R-2707D, R-2707E and R-2707F
Project Information Right Table
Estimated Cost:$284 million
Start Date:July 2013
Completion Date:2029
Project Overview

​​​​​​​​​​​​​​​Traffic Information

What's traffic like in the U.S. 74 Shelby Bypass project area?

For real-time traffic information, please visit drivenc.gov or follow NCDOT on Twitter​.​
​The N.C. Department of Transportation is building an 18.5-mile four-lane divided highway from east of Mooresboro to west of Stony Point Road at U.S. 74 Business in Kings Mountain.

The U.S. 74 Shelby Bypass will help improve traffic flow through and around Shelby by providing a controlled-access route, meaning the roadway will only be accessible at interchanges.

Future traffic projections indicate that without the improvements to U.S. 74, traffic conditions would become too congested to operate efficiently and become increasingly unsafe. Traffic delays on the existing highway would continue to grow, as would the accident rates.

The bypass is expected to generate economic development around Shelby. Some examples of this development include the Walmart Distribution Center, Clearwater Paper, and Hannah Park. 