N.C. 73 Improvements (Mecklenburg & Cabarrus)

N.C. 73 Improvements (Mecklenburg & Cabarrus)
The map above shows only the project's general location. (View detailed maps.)
Project Information Left Table
County:Multiple
Status:In Development
STIP Number:R-2632AB, R-5706
Project Information Right Table
Estimated Cost:$348 million
Start Date:2026
Completion Date:TBD

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​Project Overview

​​​​​​​​​​​​​​​Public Comment

To receive updates about this project, visit the NCDOT public input portal​.
Planning and design are underway to widen a 14-mile stretch of N.C. 73 from two to four lanes between N.C. 115 (Old Statesville Road) and U.S. 29 (Concord Parkway North) in Mecklenburg and Cabarrus counties.

Planning, design and construction for the improvements will be completed as two separate projects, listed as R-2632AB and R-5706 in the N.C. Department of Transportation’s State Transportation Improvement Program​

The first project (R-2632AB) involves widening N.C. 73 (Sam Furr Road) from N.C. 115 (Old Statesville Road) to Davidson-Concord Road in Mecklenburg County to help reduce traffic congestion. Improvements would also include providing bicycle and pedestrian accommodations.

The second project (R-5706) involves widening N.C. 73 from Davidson-Concord Road in Mecklenburg County to U.S. 29 in Cabarrus County and would include multiuse paths for bicycles and pedestrians from Davidson-Concord Road to Interstate 85, and bicycle lanes and sidewalks from I-85 to US 29. The project is divided into two sections that have separate right of way and construction schedules but are being evaluated under one environmental document. 

  • Section A would widen N.C. 73 from east of Davidson-Concord Road to east of Poplar Tent Road near the Mecklenburg/Cabarrus county line.
  • Section B would widen N.C. 73 from east of Poplar Tent Road to U.S. 29 in Cabarrus County.
Section A and Section B will be reprioritized for funding in the next State Transportation Improvement Program​. A schedule for right of way, utilities and/or construction has not been finalized at this time. However, preliminary engineering activities (design, planning, environmental studies) needed for project development are underway.​

Additional proposed improvements along this corridor include proposed improvements to N.C. 73 in Lincoln, Mecklenburg and Cabarrus counties. 

Upcoming Public Meetings

There are no upcoming public meetings for this project.

Project Funding

This project is listed as Project R-2632AB and R-5706 in the N.C. Department of Transportation's State Transportation Improvement Program


​*Estimated costs based on the NCDOT Draft 2024-2033 STIP, subject to change​​

Project Timeline

​ ​​​​​​​*Future dates subject to change ​​​

Contact

Radha Attaluri, P.E.

Senior Project Manager
NCDOT Project Management Unit, Divisions 7, 9, 10

1582 Mail Service Center
Raleigh, NC 27699-1582

Sierra Wolf, P.E.

Consultant Project Manager
WSP

1001 Morehead Square Drive, Suite 610
Charlotte, NC 28203