Page ContentNCDOT held a public meeting on Oct. 12, 2017, in Lenoir to present the recommended design for the project. The materials, maps and videos presented at the meeting are available below for review. U.S. 321 Widening (Hickory to Lenoir) Public Meeting Handout (October 2017)PDF • 1MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Section A Map (October 2017)PDF • 15MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Section B Map (October 2017)PDF • 17MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Section C Map (October 2017)PDF • 13MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Clement Boulevard Map (October 2017)PDF • 3MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Grace Chapel Road Map (October 2017)PDF • 3MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Alex Lee Boulevard Map (October 2017)PDF • 3MB • October 12, 2017U.S. 321 Widening (Hickory to Lenoir) Post-Public Meeting SummaryPDF • 2MB • November 17, 2017 7/10/2018 10:18 AM