Page Content U.S. 321 Widening (Hickory to Lenoir) Public Meeting Handout (July 2016)PDF • 4MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Hearing Map Overview (1MB) (July 2016)PDF • 1MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Section A (July 2016 Design)PDF • 18MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Grace Chapel Road Crossing (July 2016 Design)PDF • 9MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Section B (July 2016 Design)PDF • 18MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Falls Avenue Crossing (July 2016 Design)PDF • 15MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Section C (July 2016 Design)PDF • 14MB • July 11, 2016U.S. 321 Widening (Hickory to Lenoir) Post-Public Meeting SummaryPDF • 1MB • November 15, 2016 7/10/2018 10:18 AM