The project would construct two additional travel lanes in each direction, bringing the total number of lanes from four to eight.
With the exception of the Fayetteville Road/Exit 22, which has been reconstructed into a
diverging diamond interchange, every bridge in this stretch of I-95 through mile marker 37 must be replaced with bridges that are longer, higher and wider. The on- and off-ramps will be improved, and some will have
roundabouts to improve safety and mobility.