​​​The project would construct two additional travel lanes in each direction, bringing the total number of lanes from four to eight.

With the exception of the Fayetteville Road/Exit 22, which has been reconstructed into a diverging diamond interchange, every bridge in this stretch of I-95 through mile marker 37 must be replaced with bridges that are longer, higher and wider. The on- and off-​ramps will be improved, and some will have roundabouts to improve safety and mobility.
​ 