-
401 Corridor Study
STIP Number:R-2609
-
The purpose of the US 401 Corridor Study is to identify deficiencies in the existing corridor and develop alternatives for accommodating future growth in traffic volumes.
|
-
Bonner Bridge Replacement
STIP Number:B-2500
-
The Bonner Bridge Replacement Project will replace the existing bridge over Oregon Inlet in Dare County and provide for the long-term retention of N.C. 12 between Oregon Inlet and Rodanthe.
|
-
Business 40
STIP Number:U-2827B
-
The North Carolina Department of Transportation is beginning the project development studies for Business 40 (also known as I-40 Business) from west of 4th Street to east of Church Street in Winston-Salem.
|
-
Cape Fear Skyway
STIP Number:U-4738
-
New location roadway south of Wilmington, including a bridge over the Cape Fear River, from US 17 Bypass to US 421.
|
|
|
-
East End Connector
STIP Number:U-0071
-
The East End Connector will provide a direct connection between the Durham Freeway (NC 147) and US 70 (Miami Boulevard)
|
-
Fire Tower Road Proposed Extension
STIP Number:U-5006
-
The North Carolina Department of Transportation proposes to extend Fire Tower Road (S.R. 1708) from the proposed Greenville Southwest Bypass to Memorial Drive (N.C. 11/903) in Pitt County, NC near the City of Greenville and the Town of Winterville.
|
-
Garden Parkway
STIP Number:U-3321
-
The North Carolina Turnpike Authority (NCTA) and the North Carolina Department of Transportation (NCDOT) propose to improve east-west travel between I-85 west of Gastonia in Gaston County and I-485/NC 160 in Mecklenburg County and improve connectivity between southern Gaston County and Mecklenburg County.
|
-
Greensboro Urban Loop
STIP Number:U-2524, U-2525
-
The Greensboro Urban Loop which is the proposed I-785/I-840 will help improve congestion on existing I-40, particularly in the area where I-40, I-85 Business and U.S. Routes 29, 70, 220 and 421 all run concurrently.
|
-
Greenville Southwest Bypass Study
STIP Number:R-2250
-
NCDOT is preparing an engineering and environmental study to ease existing and anticipated
traffic congestion on NC 11 (Memorial Drive) and Stantonsburg Road (SR 1467 and US 264
Business) through portions of Pitt County, Greenville.
|
-
I-26 Connector, Asheville, NC
STIP Number:I-2513
-
An interstate highway to connect I-26 from the I-26/I-40/I-240 interchange southwest of Asheville to US 19-23-70 north of Asheville.
|
-
I-40 Widening - Southeast Raleigh to Clayton Project
STIP Number:I-5111
-
The I-40 Widening - Southeast Raleigh to Clayton Project will focus on improving I-40 from the beltline in Raleigh, to NC 42 in Johnston County, by adding additional travel lanes to ease congestion throughout this section of I-40.
|
-
I-440 Improvements
STIP Number:U-2719
-
This project will widen I-440 East and West between north of Wade Avenue and south of Walnut Street.
|
|
|
-
Independence Boulevard Extension
STIP Number:U-4434
-
Extension of SR 1209 (Independence Boulevard) from Randall Parkway to US 74 (Martin Luther King, Jr. Parkway)
|
-
Kinston Bypass Project
STIP Number:R-2553
-
The Kinston Bypass Project is approximately 12 miles in length from US 70 near LaGrange, in Lenoir County, to US 70 near Dover, in Craven County.
|
-
Long-Term Solutions for N.C. 12 Breaches
STIP Number:B-2500 A,B
-
NCDOT is working to provide long-term solutions for the two breaches caused by Hurricane Irene in August 2011 along N.C. 12 on the Pea Island National Wildlife Refuge and in Rodanthe.
|
-
Macy Grove Road Improvements Project
STIP Number:U-2800, U-4734
-
The Macy Grove Road improvements and extension will provide additional traffic carrying capacity between I-40 Business and areas north of Kernersville.
|
-
Mid-Currituck Bridge Project
STIP Number:R-2576
-
The North Carolina Turnpike Authority (NCTA) proposes to build a toll bridge across Currituck Sound that would connect the mainland with the Outer Banks in Currituck County.
|
-
Monroe Connector/Bypass
STIP Number:R-3329, R-2559
-
New location roadway from US 74 at I-485 in eastern Mecklenburg County to US 74 near the Town of Marshville in Union County.
|
-
NC 105 Widening Project
STIP Number:R-2566
-
The N.C. Department of Transportation proposes to widen a 14.6 mile section of N.C. 105 from two lanes to four lanes with a raised grass median from U.S. 221 in Linville to N.C. 105 Bypass (State Road 1107) in Boone. N.C.
|
-
NC 107 Connector
STIP Number:R-4745
-
Study of constructing a new road from N.C. 107 to U.S. 23-74 east of Sylvia in Jackson County.
|
-
NC 109 Improvements
STIP Number:R-2568C
-
Improvements to NC 109 from Old Greensboro Road (SR 1798) in Davidson
County to I-40/US 311 in Forsyth County.
|
-
NC 119 Relocation Project
STIP Number:U-3109
-
NCDOT proposes to relocate NC 119 in Mebane from I-85 to existing NC 119 near
Mrs. White Lane (SR 1918) in Alamance County.
|
-
NC 12 Improvements South of Rodanthe
STIP Number:R-4070 B; R-3116 A, B
-
NCDOT is working on proposed improvements to several sections of N.C. 12 on Hatteras and Ocracoke Islands in the Outer Banks.
|
-
NC 143 Improvement Project
STIP Number:R-2822B
-
The N.C. Department of Transportation wants to improve safety on N.C. 143 west of Robbinsville from West Buffalo Creek to N.C. 143 Business. N.C. 143 is a windy, two-lane road through the mountains that serves as the primary east-west corridor for Graham County.
|
-
NC 211 Road Widening Project
STIP Number:R-2812
-
The project includes widening to a multi-lane highway with curbs and gutters, and sidewalks, as well as installing signals and signs.
|
-
NC 68 Improvements
STIP Number:W-5114
-
The North Carolina Department of Transportation (NCDOT) is proposing to improve NC 68 from south of SR 2111 (East Harrell Road) to SR 4831 (Bartonshire Drive) in Guilford County. This project is approximately 0.4 mile in length. Project W-5114 is included in NCDOT 2011-2020 Transportation Improvement Program (TIP).
|
|
|
-
Railroad Improvements
STIP Number:None
-
The NCDOT is working with the freight railroads and investing state and
federal funds on railroad track and signal improvements that will reduce
travel time, increase capacity and improve reliability for both freight and
passenger rail service along the North Carolina Railroad corridor.
|
-
Salem Creek Connector
STIP Number:U-2925
-
NCDOT will construct a new 1.1-mile, four-lane road with a median from Martin Luther King Jr. Drive south of Winston-Salem State University to Rams Drive (formerly Stadium Drive) at the Wake Forest Innovation Quarter.
|
-
Southeast High-Speed Rail
STIP Number:None
-
In 1992, the U.S. Department of Transportation designated five national high-speed rail corridors across the country. The original Southeast High Speed Rail Corridor - extending from Washington, D.C. through Richmond and Raleigh to Charlotte.
|
-
Topsail Island Bridge Replacement
STIP Number:B-4929
-
Build new bridge to replace the existing swing bridge over the Intracoastal Waterway on NC 50 / 210 in Surf City.
|
-
Triangle Expressway Southeast Extension
STIP Number:R-2721, R-2828, R-2829
-
Planning studies for the Southeast Extension in Wake and Johnston counties are underway. The Southeast Extension will extend the Triangle Expressway and complete the Raleigh Outer Loop.
|
-
US 13 /US 158 Widening Project
STIP Number:R-2507A
-
In Hertford and Gates Counties, the Design-Build Project R-2507A widens U.S. 13 / U.S. 158 from U.S. 158 / N.C. 45 near Winton to the US 158 Bypass in Tarheel.
|
-
US 158 Reidsville Road Project
STIP Number:R-2577
-
The purpose of the proposed project is to improve the traffic carrying capacity and safety along US 158, within the project limits.
|
-
US 158 Widening Project
STIP Number:R-2582, R-2584
-
The primary purpose of the proposed project is to improve traffic flow, increase safety, and to improve access to existing and potential future industry along the US 158 Corridor in Northampton County.
|
-
US 17 Business/NC 37 Improvements Project
STIP Number:R-4467
-
The purpose of this project is to continue to provide a direct, reliable route between downtown Hertford and the town of Winfall. The current route is experiencing significant deterioration and ongoing maintenance problems, jeopardizing its ability to provide reliable direct connectivity.
|
-
US 17 Hampstead Bypass
STIP Number:U-4751, R-3300
-
The purpose of the project is to improve the traffic carrying capacity and safety of the US 17 and Market Street corridor in the project area.
|
-
US 64 Asheboro Bypass
STIP Number:R-2536
-
The US 64 southern bypass of the Town of Asheboro with a connector to the North
Carolina Zoological Park. The bypass begins between Stutts Road and Phillips
Country Trail west of Asheboro and ends near Trogden Hill Road east of Asheboro.
|
-
US 64 Improvements
STIP Number:R-2544, R-2545
-
The North Carolina Department of Transportation (NCDOT) has reinitiated a project study to evaluate widening of the 27.3-mile segment of US 64 from Columbia (in Tyrrell County) to US 264 (in Dare County near Manns Harbor).
|
-
US 74 Relocation Project
STIP Number:A-9BC
-
The North Carolina Department of Transportation (NCDOT) proposes to relocate US 74 from Robbinsville to Stecoah in Graham County.
|
-
Winston Salem Northern Beltway
STIP Number:U-2579, R-2247
-
The entire Winston-Salem Northern Beltway, from US 158 southwest of the City
to US 311 southeast of the City. Includes Western Section, Eastern Section,
and Eastern Section Extension.
|