Connecting New Print Queues.
1. Click Start and Run ...
2. In the Open text field, type \\dot-ccpp01, and click OK.
3.Choose the appropriate printer according to the assigned Project Engineer's group number by double clicking on the printer queue name. Below is a chart of the appropriate printer queue names according to the assigned PE group number.
or...
double click on the .vbs file locted under each Project Engineer folder on the S: drive
This will automatically load all the print quesues for you in your squadNOTE:
| Group Queue |
01
G. Brew |
02
B.Moore |
03
G. Lovering |
04
J. Goodnight |
05
R. Thomas |
06
G. Mumford |
*Postscript
|
RD239111ps |
RD239112ps |
RD239113ps |
RD239114ps |
RD239115ps |
RD239116ps |
Microsoft |
RD239111 |
RD239112 |
RD239113 |
RD239114 |
RD239115 |
RD239116 |
Iplot
A Size |
RD01-5200a |
RD02-5200a |
RD03-5200a |
RD04-5200a |
RD05-5200a |
RD06-5200a |
Iplot
B Size |
RD01-5200b |
RD02-5200b |
RD03-5200b |
RD04-5200b |
RD05-5200b |
RD06-5200b |
Bond
Paper |
RD228556ps |
RD228556ps |
RD228557ps |
RD228557ps |
RD228558ps |
RD228558ps |
| 07
J. Speer |
08
T. Houser |
09
J. Moore |
10
T. Walls |
11
C. Haire |
12
D. Taylor |
13
C. Houser |
RD239117ps |
RD239118ps |
RD239119ps |
RD239120ps |
RD239121ps |
RD239122ps |
RD239122ps |
RD239117 |
RD239118 |
RD239119 |
RD239120 |
RD239121 |
RD239122 |
RD239122 |
RD07-5200a |
RD08-5200a |
RD09-5200a |
RD10-5200a |
RD11-5200a |
RD12-5200a |
RD13-5200a |
RD07-5200b |
RD08-5200b |
RD09-5200b |
RD10-5200b |
RD11-5200b |
RD12-5200b |
RD13-5200b |
RD228554ps |
RD228554ps |
RD208602ps |
Everywhere |
RD228554ps |
RD208602ps |
RD208602ps |
Note that each person's log-in profile should have at least five (5) or (6) print/plot queues connected.
Optional Printer Connection (connect as needed)
For full size plots to the Oce-860 plotter (plans, profiles, and cross sections( xpl));
1. Open Mapdrive.
2. Select the first TIP.
3. Navigate to the location of the full size IPS file. Usually the location of the full size IPS files are located in the R:\Roadway\iFiles\FullSize folder.
4. Double click on the full size IPS file to activate it.
5 When prompted with a message like this;

click on the pull down menu to\\dot-ccpp01\IT02-Oce860.
6. Check to see the Scale column in Iplot Organizer to see if the scale for each plot is to an even number and it has not been changed.
7. Save the IPS File and Exit out of Iplot Organizer.
8. If there are more full size IPS files, then repeat procedure starting from step number seven (7).
9. Go map to Mapdrive and choose the next TIP.
10. Repeat these steps(from 1 - 10) until the last TIP full size IPS file has been modified .