| Launch XS Movie Navigator through the RD_DSN
tool frame, RD_VBA tool family.

Job Number
After the application has been loaded, select the job
number. This application searches for the GPK file in the Job
(GPK) Directory set in the COGO preferences.
*** NOTE: Depending on how many cross section
cells are associated a particular chain, the process of selecting
the Job number will also load other information, i.e. stations,
and it may take up to one full minutes. This is normal and do
not attempt to end this process.

XS Chain
After selecting the Job Number, the chain(s) found
in the file is loaded into the XS Chain drop down combo box.
Profile
As an option, if Profile is checked and the corresponding
profile for that chain is selected, then the profile grade is
used to the lock the view moving to and from cross section.
If unchecked, default, then the green horizontal cross section
cell line is used to the lock the view moving to and from cross
sections. Ideal application is in mountaneous projects, where
drastic elevation differences are encountered moving from one
cross section to the next.
Station
If the correct Job Number and XS Chain is chosen, then
the station list is populated. Navigation from one station to
another can be done by three methods, the drop down station
combo box, the VCR styles buttons, or the automatic movie mode.
Next to the station combo box is the Fit XS To View
button to reset the view to fit the cross section view to the
width of the green cross section cell.
Navigation
A very effective method of cross section navigation,
the VCR style buttons, (1) First (2) Previous (3) Next (4) Last
cross section can be used. Under Movie Mode,
the Play Reverse, Play Forward, and the Stop buttons can also
be used. The frame rate can also be set. Default
is 2 frames per second, and it can be to a maximum of 32 frames
per second. The higher the frame rate, the faster the movie
plays from one cross section to the next.
|